PROJECTS

OIL AND PETROCHEMICAL PLANT

LIBYA

OIL AND PETROCHEMICAL PLANT
Place LIBYA WORKS DURATION 24 MONTHS SECTOR INDUSTRIAL
CONTRACTOR MONTUBI SPA DESIGNER MONTUBI SPA

PROJECT DESCRIPTION

The Work has been carried out in a secret location in Libya, in the middle of the desert, at about 400 km far from the Mediterranean shores. The poor photographic documentation is due by the impossibility to perform a complete photo-shoot for secrecy constraints imposed by the buyers. 

PERFORMED WORKS

Civil works for oil and petrochemical plants; irrigation systems. Excavations and fillings: 480.000 cubic meters
Reinforced concretes: 35.000 cubic meters